Skip to content
Vol. 01 — Made of nothing Art / Sound / Design 47.4979° N · 19.0402° E

about nothing!!

A wall in Budapest where art, sound and design make noise about absolutely nothing.

Move to spray · hold to drip
Scroll to vandalize

What is this

OXXY is not a studionope. Not a labellol. Not a brandew. It’s a wall where art, sound and design show up to make noise about nothing in particular.

Tapes on this page
06
Audio files involved
00
Length of each tape
Forever
Things that matter
None

Side A — Tape 01

Made of nothing

Every track on this tape is generated live in your browser. No files, no samples, no servers. Just maths, turned up.

01

Now playing

Powder Keg

Explosive, cheerful, slightly unhinged.

Oscilloscope — waiting for sound

BAR 000 · 00/16 · Fuse

M play / pause · N next track

    The wall

    Posters for things that never happened

    Six gigs, shows and parties, fully designed, never held. Pasted up anyway.

    01 / 06 — keep scrolling

    Budapest ✕ 31.02.2026 ✕ 23:00

    Silent
    rave

    for zero people

    Headphones not provided ✕ Music not provided

    Gallery Nowhere presents

    Exhibition of empty frames

    art!!

    Free entry. Nothing to see. Opening 00:00

    One
    note

    A concert. C♯, held for three hours.

    Tickets 0 Ft ✕ Earplugs advised

    Closingparty

    (we never opened)

    Doors: never ✕ Dress code: whatever

    World tour 2026 ✕ 0 dates

    Nobody

    Live at Nowhere ✕ Sold out (there were no tickets)

    Out now, on this page

    Vol.
    01

    Index

    Things we made about nothing

    Your turn

    Leave a tag

    Hold to spray. Hold still and it drips. It stays on this wall (well, in your browser) until you wipe it.