Demo 02 — Signal
Six loops, generated live in your browser. Press play, then scroll: every chapter below is a track, and the page changes the song as you move.
↓ Scroll to change the song
Side A — Made of nothing
Tape counter 000
Powder Keg
Explosive, cheerful, slightly unhinged.
The score
Every hit, on the grid
This is the actual pattern the engine is playing right now. Cells flash when a hit really fires, including the ones chaos sneaks in.
There are no lyrics. Everything here is instrumental.
How it works
How nothing becomes sound
- 01
Clock
A metronome that runs 120 ms ahead of your ears on the audio clock, so nothing drifts.
- 02
Score
Six loops written as text:
xis a hit, a dot is a rest. Chaos adds the mistakes. - 03
Synth
Oscillators and white noise, filtered and shaped into kicks, hats, bass and bells.
- 04
You
A compressor, then your speakers. Nothing is downloaded, recorded or kept.